Start of the expansion of the production and warehouse
March 2008
- Starting point for the expansion of the production and warehouse in March 2008.
- The continual growth since CTS Clima Temperatur Systeme GmbH was founded in 1996 calls for an additional production hall of approx. 1300m2 and the expansion of the warehouse by 350m2.
- expected ready to move: October 2008.